HALFWAY BENCH

7/11/18

Engineering Magic

Adventure Location:Decatur, Al.
Adventure Date:July, 2018
Click a pic to enlarge it.

Last evening this area had about 2 inches of water puddled in it. During the morning walk we noticed that the water was gone and ant engineering and construction team had built a road across the soft mud to the small grassy hump out in the middle. This road was around 15 feet long and a real marvel to build in less than a day.



Not a lot has been happening here but some new pictures from the rest of the family’s trip to the beach a couple of weeks ago came in. Here is grandson Gavin working hard at trying to have tooooo much fun.

No comments:

Post a Comment